The structure will have an initial capacity of 100 MW, with an expansion planned for up to 400 MW, and will be powered by 100% renewable energy
Check the full article: https://iabrasilnoticias.com.br/rt-one-compra-terreno-onde-construira-data-center-de-r-6-bi-no-oeste-de-uberlandia/

